An 8.5" X 10" wall bracket in landscape orientation.
Insert size: 8.5" high X 10" wide.
Mounted on a standard steel base (finish: black powder coat).
The base is designed to mount on the wall using countersunk screws. The bracket fits into the base and is secured with decorative nuts.
The basic model consists of:
That configuration can be changed according to the options below.